Sunday, March 14, 2010

ISO 9001 Standards Training DVD

Origin Of ISO 9000 Standards

The story of ISO 9000 Standards is a story of standards, methods and regulation. The brief
history that follows is in no way comprehensive but is intended to illustrate
four things:
1. that ISO 9000 standards are an ancient concept that survived several millennia;
that a means of verifying compliance often follows the setting of
standards;
2. that the formalizing of working practices is centuries old and seen as a
means to consistently meet standards;
3. that market regulation (relative to the standard of goods and services) has
been around for centuries for the protection of both craftsmen and
traders.
4. ISO 9000 is a symptom of practices that were around centuries before anyone
coined the term quality management. It is in some respects a natural
progression that will continue to evolve. The story is told from a British
viewpoint.

ISO 9000 grew out of BS 5750, a standard published by the British Standards Institution (BSI) in 1979. Initially, it was used only in manufacturing industries. ISO 9000 is now employed across a variety of other types of businesses. It is a set of international standards of quality management systems. ISO 9000 has been accepted by more than 100 countries as their national quality assurance standard by the end of 1997.
The history of ISO 9000 Standards dates back to Mil-Q-9858a, the first quality standard for military procurement established in 1959 by the US. By 1962, NASA (National Aeronautics and Space Administration) developed its quality system requirements for suppliers. In 1965, NATO (North Atlantic Treaty Organization) accepted the AQAP (allied quality assurance procedures) specifications for the procurement of equipments.
During the 1970s, BSI published BS 9000 (the first UK standard for quality assurance) and BS 5179 (guidelines for quality assurance) norms. In 1979, it created BS 5750, a series of standards for use by manufacturing companies. They were enforced through assessments and audits. In 1988, ISO (International Standards Organization) adopted the BS 5750 standard without changes and published it globally under the name ISO 9000. The ISO adopted this standard with a view to create an international definition of the necessary characteristics of a quality system for all businesses, regardless of industry. In 1994, the ISO revised the ISO 9000 standard and published it globally.
In the beginning, ISO 9000 was implemented exclusively by large companies. But by mid-1990s, small and mid-sized companies began to increasingly implement these standards. In the United States, the total number of registrations increased from a little more than 2,200 in 1993 to more than 17,000 in 1998. Of these 17,000 registrations, almost 60 percent were held by businesses with annual sales of $100 million or less.

Thursday, December 31, 2009

Version Of ISO 9001 Standard

1987 version

ISO 9000:1987 had the same structure as the UK Standard BS 5750, with three ‘models’ for quality management systems, the selection of which was based on the scope of activities of the organization:

ISO 9001:1987 Model for quality assurance in design, development, production, installation, and servicing was for companies and organizations whose activities included the creation of new products.

ISO 9002:1987 Model for quality assurance in production, installation, and servicing had basically the same material as ISO 9001 but without covering the creation of new products.

ISO 9003:1987 Model for quality assurance in final inspection and test covered only the final inspection of finished product, with no concern for how the product was produced.

ISO 9000:1987

1994 version

was also influenced by existing U.S. and other

emphasized quality assurance via preventive actions, instead of just checking final product, and continued to require evidence of compliance with documented procedures. As with the first edition, the down-side was that companies tended to implement its requirements by creating shelf-loads of procedure manuals, and becoming burdened with an ISO bureaucracy. In some companies, adapting and improving processes could actually be impeded by the quality system.

The ISO 9000 standard is continually being revised by standing technical committees and advisory groups, who receive feedback from those professionals who are implementing the standard.2008 version

ISO 9001:2008 only introduces clarifications to the existing requirements of ISO 9001:2000 and some changes intended to improve consistency with ISO 14001:2004. There are no new requirements. Explanation of changes in ISO 9001:2008. A Practical Guide to ISO 9001:2008 Implementation A quality management system being upgraded just needs to be checked to see if it is following the clarifications introduced in the amended version.

combines the three standards 9001, 9002, and 9003 into one, called 9001. Design and development procedures are required only if a company does in fact engage in the creation of new products. The 2000 version sought to make a radical change in thinking by actually placing the concept of process management front and center (”Process management” was the monitoring and optimizing of a company’s tasks and activities, instead of just inspecting the final product). The 2000 version also demands involvement by upper executives, in order to integrate quality into the business system and avoid delegation of quality functions to junior administrators. Another goal is to improve effectiveness via process performance metrics — numerical measurement of the effectiveness of tasks and activities. Expectations of continual process improvement and tracking customer satisfaction were made explicit.

ISO 9001 Quality Policy

On customers
We will listen to our customers, understand and balance their needs and
expectations with those of our suppliers, employees, investors and society and
endeavour to give full satisfaction to all parties.
On leadership
We will establish and communicate our vision for the organization and through
our leadership exemplify core values to guide the behaviour of all to achieve our
vision.
On people
We will involve our people in the organization’s development, utilize their
knowledge and experience, recognize their contribution and provide an environ-
ment in which they are motivated to realize their full potential.
On processes and systems
We will take a process approach towards the management of work and manage our
processes as a single system of interconnected processes that delivers all the
organization’s objectives.
On continual improvement
We will provide an environment in which every person is motivated to
continually improve the efficiency and effectiveness of our products, processes and
our management system.
On decisions
We will base our decisions on the logical and intuitive analysis of data collected
where possible from accurate measurements of product, process and system
characteristics.
On supplier relationships
We will develop alliances with our suppliers and work with them to jointly
improve performance.
http://www.iso-consults.com
http://www.iso9001store.com
http://www.iso14000store.com


ISO 9001:2008 General Requirements

4.1 General requirements

The organization shall establish, document, implement and maintain a quality management system and continually improve its effectiveness in accordance with the requirements of this International Standards. The organization

  • shall determine the processes needed for the quality management system and their application throughout the organizations,
  • determine the sequence and interaction of these processes,
  • determine criteria and methods needed to ensure that both the operation and control of these processes are effective,
  • ensure the availability of resources and information necessary to support the operation and monitoring of these processes,
  • monitor, measure (where applicable) and analyze these processes, and
  • implement actions necessary to achieve planned results and continual improvement of these processes.

These processes shall be managed by the organization in accordance with the requirements of this International Standard.

Where an organization chooses to outsource any process that affects product conformity to requirements, the organization shall ensure control over such processes. The type and extent of control to be applied to these outsourced processes shall be defined within the quality management system.

NOTE 1: Processes needed for the quality management system referred to above include processes for management activities, provision of resources, product realization and measurement, analysis and improvement.

NOTE 2: An outsourced process is identified as one being needed for the organization’s quality management system, but chosen to be performed by a party external to the organization.

NOTE 3: Ensuring control over outsourced processes does not absolve the organization of the responsibility of conformity to all customer, statutory, and regulatory requirements. The type and extent of control to be applied to the outsourced process can be influenced by factors such as
a) the potential impact of the outsourced process on the organization’s capability to provide product that conforms to requirements,
b) the degree to which the control for the process is shared;
c) the capability of achieving the necessary control through the application of clause 7.4.

Clause 4.2 Documentation requirements

4.2.1 General

The quality management system documentation shall include
documented statements of a quality policy and quality objectives,

  • a quality manual,
  • documented procedures and records required by this International Standard,
  • documents including records, needed determined by the organization to be necessary to ensure the effective planning, operation and control of its processes

NOTE 1: Where the term “documented procedure” appears within this International Standard, this means that the procedure is established, documented, implemented and maintained. A single document may include the requirements for one or more procedures. A requirement for a documented procedure may be covered by more than one document.

NOTE 2: The extent of the quality management system documentation can differ from one organization to another due to the size of organization and type of activities, the complexity of processes and their interactions, and the competence of personnel.

NOTE 3: The documentation can be in any form or type of medium.

4.2.2 Quality Manual

The organization shall establish and maintain a quality manual that includes the scope of the quality management system, including details of and justification for any exclusions (see 1.2), the documented procedures established for the quality management system, or reference to them, and a description of the interaction between the processes of the quality management.

4.2.3 Control of documents

Documents required by the quality management system shall be controlled. Records are a special type of document and shall be controlled according to the requirements given in 4.2.4.

A documented procedure shall be established to define the controls needed

  • to approve documents for adequacy prior to issue,
  • to review and update as necessary and re-approve documents,
  • to ensure that the changes and the current revision status of documents are identified,
  • to ensure that relevant versions of applicable documents are available at points of use,
  • to ensure that documents of external origin are identified and their distribution controlled, and
  • to prevent the unintended use of obsolete documents, and to apply suitable identification to them if they are retained for any purpose.

4.2.4 Control of records

Records established to provide evidence of conformity to requirements and of the effective operation of the quality management system shall be controlled. The organization shall establish a documented procedure to define the controls needed for the identification, storage, protection, retrieval, retention, and disposition of records. Records shall remain legible, readily identifiable, and retrievable.


Wednesday, December 16, 2009

Organizations preparing to implement a QMS For ISO 9001


Organizations preparing to implement a QMS For ISO 9001

For organizations that are in the process of implementing a QMS, and wish to meet the requirements of ISO 9001:2008, the following comments may be useful.
For organizations that are in the process of implementing or have yet to implement a QMS, ISO 9001:2008 emphasizes a process approach. This includes:
- Identifying the processes necessary for the effective implementation of the quality management system
- understanding the interactions between these processes.
- documenting the processes to the extent necessary to assure their effective operation and control. (It may be
appropriate to document the processes using process maps. It is emphasized, however, that documented process maps are not a requirement of ISO 9001:2008.)
These processes include the management, resource, product realization and measurement processes that are relevant
to the effective operation of the QMS.
Analysis of the processes should be the driving force for defining the amount of documentation needed for the quality management system, taking into account the requirements of ISO 9001:2008. It should not be the documentation that drives the processes.


ISO 9000 Standards – Design and development

ISO 9000 Standards – Design and development

Planning the design and development of a product means determining the design objectives and the design strategy, the design stages, timescales, costs, resources and responsibilities needed to accomplish
them. Sometimes the activity of design itself is considered to be a planning activity but what is being planned is not the design but the product.

The purpose of planning is to determine the provisions needed to achieve an objective. In most cases, these objectives include not only a requirement for a new or modified product but also requirements governing the costs and product introduction timescales (Quality, Cost and Delivery or QCD). Remove these constraints and planning becomes less important but there are few situations when cost and time is not a constraint. It is therefore necessary to work out in advance whether the objective can be achieved within the budget and timescale. One problem with design is that it is often a journey into the unknown and the cost and time it will take cannot always be predicted. It may
in fact result in disaster and either a complete reassessment of the design objective or the technology of the design solution. This has been proven time and again with major international projects such as Concorde, the Channel Tunnel and the International Space Station. Without a best guess these projects would not get off (or under!) the ground and so planning is vital firstly to get the funding and secondly to define the known and unknown so that risks can be assessed and quantified.

Design and development plans need to identify the activities to be performed, by whom they will be perform and when they should commence and be complete. One good technique is to use a network chart (often called a PERT chart), which links all the activities together. Alternatively a bar chart may be adequate. There does need to be some narrative in addition as charts in isolation rarely conveys everything required.

Design and development is not complete until the design has been proven as meeting the design requirements, so in drawing up a design and development plan you will need to cover the planning of design verification and validation activities. The plans should identify as a minimum:
- The design requirements
- The design and development programme showing activities against time
- The work packages and names of those who will execute them (Work
packages are the parcels of work that are to be handed out either internally or to suppliers)
- The work breakdown structure showing the relationship between all the parcels of work
- The reviews to be held for authorizing work to proceed from stage to
stage
- The resources in terms of finance, manpower and facilities
- The risks to success and the plans to minimize them
- The controls that will be exercised to keep the design on course
Planning for all phases at once can be difficult as information for subsequent phases will not be available until earlier phases have been completed. So, your design and development plans may consist of separate documents, one for each phase and each containing some detail of the plans you have made for subsequent phases.
Your design and development plans may also need to be subdivided into
plans for special aspects of the design such as reliability plans, safety plans, electromagnetic compatibility plans, configuration management plans. With simple designs there may be only one person carrying out the design activities. As the design and development plan needs to identify all design and development activities, even in this situation you will need to identify who carries out the design, who will review the design and who will verify the design. The same person may perform both the design and the design verification activities, however, it is good practice to allocate design verification to another person or organization because it will reveal problems overlooked by the designer. On larger design projects you may need to employ staff of various disciplines such as mechanical engineers, electronic engineers, reliability engineers etc. The responsibilities of all these people or groups need to be identified and a useful way of parcelling up the work is to use work packages that list all the activities to be performed by a particular group. If you subcontract any of the design activities, the supplier’s plans need to be integrated with your plans and your plan should identify which activities are the supplier’s responsibility. While purchasing is dealt with in clause 7.4 of the standard, the requirements also apply to design activities.